Procedure Title: D&D Work Control Center Operating Procedure

Number: OP-AD-119

Author: James H. Chrzanowski  

ATI: Erik Perry

RLM: Mike Williams

Procedure Requirements:

NSTX Work Permit (TBD)

Lockout/Tagout (OP-AD-61)

TFTR Work Permit (OP-AD-09)

Door Permit (OP-G-93)

Tritium Work Permit (OP-AD-49)

T-MOD (OP-AD-03)

RWP (HP-OP-20)

Lift Procedure (ENG-021)

Confined Space Permit

DCA/DCN (OP-AD-104)

Pre-job brief (OP-AD-79)

ATI Walkdown

USQD (OP-AD-63)

Independant Review

Master Equip. List Mod (OP-AD-112)

ES&H Review (NEPA, IH, etc)

Flame Permit